2004 Basin Summary Report

The following represents the 2004 Basin Summary Report. The link immediately below is the document in its entirety. The links below that are the different sections of the document for those patrons who don't wish to view and wait for the download of the 4.6 MB main document. All documents are in PDF format, and require Adobe® Acrobat Reader, available here.
2004 - Complete (4,757 KB)
Executive Summary (285 KB) Segment 0603 - B. A. Steinhagen Lake (224 KB) Segment 0704 - Hillebrandt Bayou (238 KB)
Table of Contents (90 KB) Segment 0607 - Pine Island Bayou (315 KB) Segments 2411 & 2412 - Sabine Pass and Sabine Lake (206 KB)
Introduction (284 KB) Segment 0608 - Village Creek (313 KB) Conclusions and Recommendations (122 KB)
Public Participation and Outreach (185 KB) Segment 0609 - Angelina River below Sam Rayburn Reservoir (211 KB) Appendix A - Basin Action Summary (83 KB)
Technical Summary (130 KB) Segment 0701 - Taylor Bayou above Tidal (263 KB) Appendix B - Steering Committee Members (95 KB)
Watershed Summaries (173 KB) Segment 0702 - Intracoastal Waterway Tidal (232 KB) Appendix C - Data Screening Results (Lower Neches Basin) (361 KB)
Segment 0601 - Neches River Tidal (218 KB) Segment 0703 - Sabine-Neches Canal Tidal (188 KB) Appendix D - Data Screening Results (Neches-Trinity Coastal Basin) (248 KB)
Segment 0602 - Neches River below B. A. Steinhagen Lake (269 KB)   Appendix E - Glossary (99 KB)